35%

Nuie 1700mm L-Shaped Left-Hand 8 Jet Whirlpool Bath

£660.40 (inc. VAT)Was £1,016.00

In Stock

Available 5-7 days

Product Description

A built-in bath from nuie that fits neatly into an alcove, delivering a considered collection that works together from the start and everyday comfort. Featuring warm-to-touch acrylic body that retains...

In Stock


Fast Delivery

Available for Fast Delivery

Free click and collect

At our Showroom in Peterborough

Free returns

Returns within 30 Days


Product Description

A built-in bath from nuie that fits neatly into an alcove, delivering a considered collection that works together from the start and everyday comfort. Featuring warm-to-touch acrylic body that retains heat well. A practical option for everyday family bathing.

Specification

H405 x W850 x L1798mm
Volume – 235 Litre
Displaced Capacity – 165 Litre
Material – Acrylic
Bath Material Thickness – 4mm
Colour/Finish – White
Style – Contemporary
Jet Finish – Chrome
No. Of Jets – 8 (6 large directional, 2 micro)
No Tapholes
Flush-fit Pneumatic Control System
Low-Noise, Energy-Efficient Pump
Ce Certified
Leg Set Included
Bath Panel Not Included
Waste Not Included

Contact us with any Queries you may have

    Full Name
    Telephone
    Email Address
    Your Message